Write the type-test limits into a selection tool: only tested kits, the right form and ingress rating, the right depth, busbar size per current, module size per cable size. Sales then cannot quote an untested combination.
Test by module, then verify variants by design rule
Test the building blocks once. Show that derived variants follow the same design rules instead of testing every board.
Keep a formal drawing for every part
Parts without drawings cannot be audited, checked or competitively quoted. A drawing also settles who owns the design.
Hold the certificate before you sell
Get type-test certificates in the name of the maker who will deliver, then take orders.
Start with components, not a finished product
Build capability on parts and sub-assemblies first. Add an own product when the base is proven.